CAMPUS CERTOSA
DETAILS
Period of implementation:
1999 – Study of pre-feasibility
2001 – Construction work start
Construction work end: September 2015
Number of dwellings: 136 dwellings for a total of 293 beds.
Sizes of the dwellings: Different cuts and sizes from studio flat to four rooms
– study room:
– relaxation/lunch room;
– gym;
– communal kitchen;
– reception area
The residence is situated near the Bovisa campus of the Politecnico di Milano and a few minutes away from the new -trade fair district of Rho/Pero and the Niguarda, Buzzi and Sacco hospitals. Campus Certosa is well-served by public transport (the cross-city railway and surface public transport) and is easy to reach by car thanks to its proximity to the expressways.
For over ten years the structure has been the point of reference for Politecnico students, as well as being the favoured destination of international scholarship students.
The management of the student residence is entrusted to In-Domus S.r.l., a company set up by FHS to manage student residences.
The student residence has been in operation since 4 September 2005.
InvestiRE Sgr
Fondo Immobiliare di Lombardia
FUND INSIDE THE INTEGRATED SYSTEM OF FUNDS OF
CDP Investimenti Sgr
TECHNICAL AND SOCIAL ADVISOR
Fondazione Housing Sociale
PROMOTERS
Fondazione Housing Sociale
Fondazione Cariplo
PUBLIC/PRIVATE PARTNERSHIP
Investire S.g.r. and In-Domus S.r.l. have signed an agreement with Milan Municipality to guarantee the availability of at least 70% of the beds in the student residence to out-of-town students at affordable rents.
Studio CAPUTO
RESIDENCE MANAGEMENT
In-Domus